See how better workflows and stronger risk controls can protect time, capacity and margin.
A schedule commits people to a date. A readiness check confirms they can actually work when they arrive.
Potential net savings / year
After recurring control costs.
Research-based composite. Business figures, savings and risk ratings are modeled assumptions. Proposed controls have not been validated with a business.
The proposed constraint is the handoff from planned work to confirmed work. Dispatch uses dates without a common acceptance test for materials, access, approvals, and predecessor completion. Hiring more installers would increase the number of people exposed to the same blocked starts.
Confirm materials, access and approvals before dispatch. Give crews a ready-work backup plan.
Proposed workflow: make the next action and responsibility explicit.
| Hypothesis | Evidence to inspect | Proposed test |
|---|---|---|
| Material exists only on paper | Compare PO, supplier promise, physical receipt and issued quantity. | Ten upcoming starts; verify kit against work package. |
| Predecessor or access incomplete | Compare GC readiness confirmation with actual first work time. | Walk one workfront a day before mobilization. |
| Last-minute changes bypass dispatch | Trace who learns of changed start dates and when. | Audit two weeks of schedule changes and acknowledgments. |
| Workload is a real labor constraint | Check blocked hours against paid overtime and completed quantities. | If ready work still exceeds staffed hours, reassess capacity. |
| Measure | Calculation | Modeled implication |
|---|---|---|
| Field delay load | 6 crews x 5 people x 2 hours/week | 60 person-hours/week |
| Target delay load | Same crews x 1 hour/week | 30 person-hours/week |
| Capacity released | 60 less 30 | 30 person-hours/week |
| Cash conversion assumed | 10 of the 30 hours replace paid overtime | Remaining 20 hours not monetized |
| Work package | Readiness evidence | Release decision |
|---|---|---|
| E-104 / Level 2 rough-in | Kit received; access confirmed; drawing C | GREEN - release five-person crew |
| E-105 / switchgear terminations | Equipment delivery unconfirmed | RED - reassign crew to E-104 |
| E-106 / exterior supports | Only east area accessible | AMBER - PM approves limited scope |
Observe ten starts, baseline losses, agree release criteria.
Evidence: Ten work packages with cause-coded baseline.
Pilot release gate with two crews and ready-work backup list.
Evidence: At least 90% of pilot starts have evidence before dispatch.
Expand only after false-green causes are corrected.
Evidence: Four weeks of release, delay and payroll records.
Validate recurring savings; set weekly risk review.
Evidence: Comparable output, fewer paid hours and invoice evidence.
| Measure | Definition | Target | Owner / review |
|---|---|---|---|
| Ready starts | Evidence-complete starts / all planned starts | At least 95% | Dispatcher / daily |
| Delay load | Lost person-hours / crew-week | 10 to 5 | Foreman / daily |
| Overtime | Paid hours caused by readiness problems | 20 to 10 weekly | Payroll + PM / weekly |
| False-green starts | Released starts that encounter known blockers | Zero; investigate each | Ops manager / weekly |
Use four baseline weeks and four pilot weeks with comparable crew size, job phase and installed quantity. Reconcile all reduced overtime to payroll. Treat a reduction in waiting without a reduced payment as capacity improvement only.
This models avoidable operating expenditure. Time released without a reduced payment is reported separately as capacity.
| Financial line | USD |
|---|---|
| Overtime avoided | $31,680 |
| Emergency delivery cost avoided | $3,000 |
| Gross annual benefit | $34,680 |
| Recurring annual control cost | $1,800 |
| Annual net run rate | $32,880 |
| First-year net benefit | $20,900 |
Adjust the share of the modeled improvement achieved. Control and setup costs stay the same.
First year: 10 benefit months, less the full setup allowance. Results are illustrative, not a guarantee.
These inputs describe the 100% modeled case. The slider changes the share of the proposed improvement achieved.
| Illustrative assumption | Value | Units |
|---|---|---|
| Overtime before | 20 | hours/week |
| Overtime after | 10 | hours/week |
| Avoidable overtime cost | 66 | USD/hour |
| Operating weeks | 48 | weeks/year |
| Emergency deliveries before | 4 | per month |
| Emergency deliveries after | 2 | per month |
| Delivery premium | 125 | USD/delivery |
| Calendar months | 12 | months/year |
| Recurring control cost | 150 | USD/month |
| One-time implementation allowance | 6,500 | USD |
| Benefit months in first year | 10 | months |
Overtime avoided: (20 - 10) x $66 x 48
Emergency delivery cost avoided: (4 - 2) x $125 x 12
Gross annual benefit: Payroll + delivery premiums
Recurring annual control cost: $150 x 12
Annual net run rate: Gross benefit less recurring cost
First-year net benefit: Annual net x 10/12 - $6,500
No extra revenue, fixed payroll reduction, penalty avoidance or regular-time capacity value is included. The implementation allowance includes internal setup effort and a provisional external-support budget; it is not a LeanLine quotation.
The delivery-risk illustration is separate from the annual operating model. Standby, recovery payroll and freight can overlap its benefits. Do not add the two figures.
Eight modeled risks. Assessment horizon: one 12-week project.
Current ratings are scenario assumptions. Select a risk to see its mitigation, owner and response.
Each number matches a risk in the register. Select an occupied cell to open a risk.
Higher likelihood and impact move a risk toward the top right. The Target view shows conditional ratings after the proposed controls.
Where several risks share a cell, it opens the first listed risk. All remain available in the register above.
One critical-equipment delivery misses the usable work window on a 12-week project.
| Scenario | Probability × event loss | Expected loss |
|---|---|---|
| Before | 30% × $45,000 | $13,500 |
| With proposed controls | 12% × $45,000 | $5,400 |
| Expected-loss reduction | Before less after | $8,100 |
| Separate mitigation cost | Over this risk horizon | $1,800 |
| Net modeled risk benefit | Reduction less mitigation cost | $6,300 |
The $45,000 event cost assumes $24,000 of incremental standby/remobilization, $9,000 of rental extension and $12,000 of recovery premiums. The probability reduction is an uncalibrated scenario assumption.
The delivery-risk illustration is separate from the annual operating model. Standby, recovery payroll and freight can overlap its benefits. Do not add the two figures.
Score = likelihood × impact, each rated from 1 to 5. Scores 1–5 are Low, 6–11 Moderate, 12–19 High and 20–25 Critical. These are scenario judgments over the stated assessment horizon.
Likelihood: 1 below 5%; 2 from 5% to below 20%; 3 from 20% to below 40%; 4 from 40% to below 70%; 5 at least 70%. Impact: 1 below $1,000; 2 below $5,000; 3 below $20,000; 4 below $75,000; 5 at least $75,000 or potentially severe safety consequences. Impact-5 safety or technical issues require specialist review regardless of score.
Public discussions informed the problem selection. LeanLine Advisory developed the composite scenario, diagnosis and proposed controls. All company profiles, financial inputs and risk ratings are illustrative assumptions. The sources do not establish an industry-wide ranking of these issues.
Start with a Free Business Bottleneck Diagnostic. Bring the problem you can see.