Worked example 04 · Custom manufacturing

The drawing changed.
Production did not.

An approved revision only protects the business when every affected job, supplier and inspection instruction changes with it.

$46,920

Potential net savings / year
After recurring control costs.

Research-based composite. Business figures, savings and risk ratings are modeled assumptions. Proposed controls have not been validated with a business.

The bottleneck

Where the work gets stuck.

The proposed bottleneck is production release after a design change. Approval and distribution are treated as the same event, but nobody verifies that all affected objects and work in process have a usable disposition. The shop is fast at making parts from an incompletely controlled instruction set.

The proposed improvement

Change how the work moves.

Link drawing changes to every affected job, supplier, program and inspection instruction.

8 to 3Scrapped parts / month · modeled
48 to 24Paid rework overtime hours / month · modeled
Read the business situation

Engineering releases a new drawing by email. Purchasing has already ordered to the old specification. A printed traveler remains at the machine. The night shift uses a program whose revision is not visible. Quality detects the mismatch after parts are completed. The team absorbs scrap, repairs and overtime, then repeats the same handoff on the next change.

60 employees, engineering-to-order work, purchased components and multiple production shifts. All quantities are scenario assumptions.

Research sources & assumptions

Public discussions informed the problem selection. LeanLine Advisory developed the composite scenario, diagnosis and proposed controls. All company profiles, financial inputs and risk ratings are illustrative assumptions. The sources do not establish an industry-wide ranking of these issues.