An approved revision only protects the business when every affected job, supplier and inspection instruction changes with it.
Potential net savings / year
After recurring control costs.
Research-based composite. Business figures, savings and risk ratings are modeled assumptions. Proposed controls have not been validated with a business.
The proposed bottleneck is production release after a design change. Approval and distribution are treated as the same event, but nobody verifies that all affected objects and work in process have a usable disposition. The shop is fast at making parts from an incompletely controlled instruction set.
Link drawing changes to every affected job, supplier, program and inspection instruction.
Proposed workflow: make the next action and responsibility explicit.
| Hypothesis | Evidence to inspect | Proposed test |
|---|---|---|
| Obsolete instructions remain in use | Compare point-of-use print, program and traveler with approved revision. | Audit ten active jobs across both shifts. |
| WIP has no change disposition | Trace open jobs and purchased stock affected by one ECO. | Account for every lot before release. |
| The issue is design error, not propagation | Separate technically incorrect design from outdated correct design. | Classify 20 nonconformances by initiating cause. |
| Suppliers miss a revision change | Match PO revision, supplier acknowledgment and received certificate. | Trace five changed purchased components end to end. |
| Measure | Calculation | Modeled implication |
|---|---|---|
| Material waste reduction | (8 - 3) scrapped parts/month | 5 purchased-material losses avoided |
| Paid repair overtime reduction | 48 less 24 hours/month | 24 hours/month avoided |
| Regular-time rework capacity | 80 less 40 hours/month | 480 hours/year released; not monetized |
| Release acceptance test | One approved revision across affected objects | No unresolved WIP disposition |
| Controlled object | Proposed revision / disposition | Release evidence |
|---|---|---|
| Drawing BR-214 + BOM | Rev D replaces C from WO-9032 | Engineering release + linked BOM |
| WIP lot L-71 / 12 parts | HOLD; engineering evaluates rework | Signed lot disposition before movement |
| CNC program + inspection | Program D; inspect changed feature | Program check + first-article approval |
Trace two changes; classify 20 nonconformances.
Evidence: Propagation failure separated from design and execution errors.
Pilot effectivity and WIP disposition on one product family.
Evidence: All affected lots and controlled objects accounted for.
Extend acknowledgments to all shifts and changed suppliers.
Evidence: No uncontrolled revision at point of use in sampled jobs.
Track separate scrap and repair populations; test containment.
Evidence: Matched mix, stable acceptance and reconciled avoidable costs.
| Measure | Definition | Target | Owner / review |
|---|---|---|---|
| Release completeness | Changed jobs with all required linked objects | 100% before release | Document control / each job |
| Revision-related scrap | Parts scrapped for wrong revision per month | 8 to 3 | Quality / monthly |
| Repair overtime | Paid repair hours on separate repairable part IDs | 48 to 24 monthly | Payroll + quality / monthly |
| Traceability | Affected lots with signed disposition | 100% | Engineering / each change |
Compare the same product families and change intensity over several months. Use nonconformance cause evidence rather than labeling every defect a revision failure. Verify purchased-material savings net of salvage and credits. Confirm that reduced repair overtime is paid time actually removed.
This models avoidable operating expenditure. Time released without a reduced payment is reported separately as capacity.
| Financial line | USD |
|---|---|
| Purchased material avoided | $31,200 |
| Repair overtime avoided | $18,720 |
| Gross annual benefit | $49,920 |
| Recurring annual control cost | $3,000 |
| Annual net run rate | $46,920 |
| First-year net benefit | $29,100 |
Adjust the share of the modeled improvement achieved. Control and setup costs stay the same.
First year: 10 benefit months, less the full setup allowance. Results are illustrative, not a guarantee.
These inputs describe the 100% modeled case. The slider changes the share of the proposed improvement achieved.
| Illustrative assumption | Value | Units |
|---|---|---|
| Scrapped parts before | 8 | per month |
| Scrapped parts after | 3 | per month |
| Unrecoverable material per part | 520 | USD/part |
| Calendar months | 12 | months/year |
| Repair overtime before | 48 | hours/month |
| Repair overtime after | 24 | hours/month |
| Avoidable overtime cost | 65 | USD/hour |
| Recurring document-control cost | 250 | USD/month |
| One-time implementation allowance | 10,000 | USD |
| Benefit months in first year | 10 | months |
Purchased material avoided: (8 - 3) x $520 x 12
Repair overtime avoided: (48 - 24) x $65 x 12
Gross annual benefit: Separate scrap and repair populations
Recurring annual control cost: $250 x 12
Annual net run rate: Gross benefit less recurring cost
First-year net benefit: Annual net x 10/12 - $10,000
No fixed payroll reduction, revenue from released capacity, assumed customer retention, or full standard-cost scrap value is included. Additional software, qualification or customer approval costs beyond the stated allowance require a revised estimate.
The event includes replacement and recovery costs that can overlap scrap and rework measures. The risk illustration is separate and must not be added to the annual savings model.
Eight modeled risks. Assessment horizon: one annual delivery program.
Current ratings are scenario assumptions. Select a risk to see its mitigation, owner and response.
Each number matches a risk in the register. Select an occupied cell to open a risk.
Higher likelihood and impact move a risk toward the top right. The Target view shows conditional ratings after the proposed controls.
Where several risks share a cell, it opens the first listed risk. All remain available in the register above.
A wrong-revision batch reaches a customer and requires field containment or replacement.
| Scenario | Probability × event loss | Expected loss |
|---|---|---|
| Before | 20% × $90,000 | $18,000 |
| With proposed controls | 8% × $90,000 | $7,200 |
| Expected-loss reduction | Before less after | $10,800 |
| Separate mitigation cost | Over this risk horizon | $2,500 |
| Net modeled risk benefit | Reduction less mitigation cost | $8,300 |
The $90,000 event impact assumes $35,000 of replacement purchased content, $25,000 of incremental field labor and $30,000 of logistics and customer recovery. Safety harm is not assigned a dollar value. Probabilities are assumed.
The event includes replacement and recovery costs that can overlap scrap and rework measures. The risk illustration is separate and must not be added to the annual savings model.
Score = likelihood × impact, each rated from 1 to 5. Scores 1–5 are Low, 6–11 Moderate, 12–19 High and 20–25 Critical. These are scenario judgments over the stated assessment horizon.
Likelihood: 1 below 5%; 2 from 5% to below 20%; 3 from 20% to below 40%; 4 from 40% to below 70%; 5 at least 70%. Impact: 1 below $1,000; 2 below $5,000; 3 below $20,000; 4 below $75,000; 5 at least $75,000 or potentially severe safety consequences. Impact-5 safety or technical issues require specialist review regardless of score.
Public discussions informed the problem selection. LeanLine Advisory developed the composite scenario, diagnosis and proposed controls. All company profiles, financial inputs and risk ratings are illustrative assumptions. The sources do not establish an industry-wide ranking of these issues.
Start with a Free Business Bottleneck Diagnostic. Bring the problem you can see.